WO-20772
Brakes · New Asset Upfit — opened Sep 25, 2026 by Dee Kowalczyk
OpenNormal priority1Poor71,331 miRFP 4.2.4 · 4.3
Work order header
Mileage and an overall condition rating are required on every work order.
Last recorded odometer on this asset: 73,218 mi
Tasks
Multiple tasks may be recorded on a single work order.
BR-FR
Front Brake Service
Replace front pads and rotors; inspect calipers and hardware.
Standard / actual
2.0 / 2.84 hrs
Employee labor
Hours are charged at each employee’s current hourly rate.
| Employee | Task | Date | Hours | Rate | Cost |
|---|---|---|---|---|---|
| Priya Raghunathan | BR-FR | Sep 25, 2026 | 2.84 | $46.00 | $130.64 |
| Labor subtotal | 2.84 | $130.64 | |||
Parts
Stock parts release from inventory; outside parts are charged to a searchable vendor.
| Part | Source | Qty | Unit cost | Extended |
|---|---|---|---|---|
CF-1044 Cabin Air Filter | Outside vendor Southern States Equipment | 3 | $19.80 | $59.40 |
| Parts subtotal | $59.40 | |||
Outside contractor costs
Vendor invoices charged directly to this work order.
No outside charges
Add a vendor invoice when work is performed by an external contractor.
Safety measurements
Tire tread depth and brake lining thickness recorded at each wheel position.
Tire Tread Depth
LF4.6 /32 in
RF9 /32 in
LR4.8 /32 in
RR9.7 /32 in
Brake Lining Thickness
LF5.9 mm
RF11.2 mm
LR6.1 mm
RR4 mm
Technician notes
Photographs
Attach photographs of the asset or of damage for documentation.
Driver side front quarter panel
IMG_1569.jpg
Cost summary
Labor
2.84 hrs
$130.64
Stock parts
0 lines
$0.00
Outside parts
1 lines
$59.40
Outside repair
0 invoices
$0.00
Total charged
$190.04
Charged to Solid Waste under budget code 62-7310-5310.
Asset
Open record- Asset number
- 00022
- Description
- 2023 Peterbilt ACX Front Loader
- Department
- Solid Waste
- Location
- Solid Waste – Transfer Station
- VIN
- T9EDVRTT6SLT9CPG0
- Plate
- WCW-4476
- Current mileage
- 73,218
- Asset condition
- 3Good