WO-20690

Brakes · Accident / Damage — opened Mar 5, 2026 by Dee Kowalczyk

All work orders
CompletedNormal priority1Poor29,692 miClosed Mar 6, 2026RFP 4.2.4 · 4.3
Work order header
Mileage and an overall condition rating are required on every work order.
Job group
Brakes
Job condition
Accident / Damage
Assigned to
Ray Fontaine
Opened by
Dee Kowalczyk
Opened on
Mar 5, 2026
Closed on
Mar 6, 2026

Last recorded odometer on this asset: 30,884 mi

Tasks
Multiple tasks may be recorded on a single work order.
BR-AIR

Air Brake Adjustment

Adjust slack adjusters and verify pushrod stroke on air brake systems.

Standard / actual

1.5 / 1.64 hrs

BR-FR

Front Brake Service

Replace front pads and rotors; inspect calipers and hardware.

Standard / actual

2.0 / 2.14 hrs

Employee labor
Hours are charged at each employee’s current hourly rate.
EmployeeTaskDateHoursRateCost
Ray FontaineBR-AIRMar 5, 20261.64$48.00$78.72
Marcus DillardBR-FRMar 5, 20262.14$58.00$124.12
Labor subtotal3.78$202.84
Parts
Stock parts release from inventory; outside parts are charged to a searchable vendor.
PartSourceQtyUnit costExtended

BP-D1210

Brake Pad Set – Rear, Light Truck

Outside vendor

Monroe Tire & Alignment

4$90.27$361.08

OL-15W40

Engine Oil – 15W-40, Gallon

Outside vendor

NAPA Auto Parts – Monroe

1$27.06$27.06

DEF-25

Diesel Exhaust Fluid – 2.5 Gallon

Released from stock2$16.05$32.10
Parts subtotal$420.24
Outside contractor costs
Vendor invoices charged directly to this work order.

No outside charges

Add a vendor invoice when work is performed by an external contractor.

Safety measurements
Tire tread depth and brake lining thickness recorded at each wheel position.
2 below minimum

Tire Tread Depth

LF8.5 /32 in
RF3.7 /32 in — below minimum
LR11.1 /32 in
RR10.2 /32 in

Brake Lining Thickness

LF2.1 mm — below minimum
RF11.3 mm
LR8.8 mm
RR5.8 mm
Technician notes
Photographs
Attach photographs of the asset or of damage for documentation.

Engine bay before repair

IMG_3914.jpg

Hydraulic leak at cylinder rod seal

IMG_6334.jpg

Cost summary

Labor

3.78 hrs

$202.84

Stock parts

1 lines

$32.10

Outside parts

2 lines

$388.14

Outside repair

0 invoices

$0.00

Total charged

$623.08

Charged to General Government under budget code 10-4110-5310.

Asset number
00469
Description
2023 Ford ProMaster 2500
Department
General Government
Location
General Government – Motor Pool
VIN
6PTPMAPS5EPBC6K9A
Plate
WGM-9240
Current mileage
30,884
Asset condition
4Excellent