WO-20300

Tires & Wheels · Warranty Repair — opened Sep 3, 2026 by Priya Raghunathan

All work orders
CompletedNormal priority2Fair11,618 miClosed Sep 7, 2026RFP 4.2.4 · 4.3
Work order header
Mileage and an overall condition rating are required on every work order.
Job group
Tires & Wheels
Job condition
Warranty Repair
Assigned to
Priya Raghunathan
Opened by
Priya Raghunathan
Opened on
Sep 3, 2026
Closed on
Sep 7, 2026

Last recorded odometer on this asset: 11,734 mi

Tasks
Multiple tasks may be recorded on a single work order.
TR-MNT

Tire Mount & Balance

Dismount, mount and road-force balance replacement tires.

Standard / actual

1.2 / 1.44 hrs

TR-ALN

Four-Wheel Alignment

Set caster, camber and toe to manufacturer specification.

Standard / actual

1.5 / 1.11 hrs

Employee labor
Hours are charged at each employee’s current hourly rate.
EmployeeTaskDateHoursRateCost
Priya RaghunathanTR-MNTSep 3, 20261.44$46.00$66.24
Ray FontaineTR-ALNSep 3, 20261.11$48.00$53.28
Labor subtotal2.55$119.52
Parts
Stock parts release from inventory; outside parts are charged to a searchable vendor.
PartSourceQtyUnit costExtended

FL-1A

Engine Oil Filter – Light Duty

Outside vendor

Emergency Vehicle Upfitters

4$10.67$42.68

ACR-134A

Refrigerant R-134a – 30lb

Outside vendor

Hydraulic Supply Co.

2$481.44$962.88
Parts subtotal$1,005.56
Outside contractor costs
Vendor invoices charged directly to this work order.

No outside charges

Add a vendor invoice when work is performed by an external contractor.

Safety measurements
Tire tread depth and brake lining thickness recorded at each wheel position.
1 below minimum

Tire Tread Depth

LF11.9 /32 in
RF6.8 /32 in
LR5.5 /32 in
RR5.5 /32 in

Brake Lining Thickness

LF2.1 mm — below minimum
RF6.4 mm
LR6.7 mm
RR3.6 mm
Technician notes
Photographs
Attach photographs of the asset or of damage for documentation.

Emergency lighting installation complete

IMG_3915.jpg

Driver side front quarter panel

IMG_2619.jpg

Undercarriage corrosion inspection

IMG_5236.jpg

Cost summary

Labor

2.55 hrs

$119.52

Stock parts

0 lines

$0.00

Outside parts

2 lines

$1,005.56

Outside repair

0 invoices

$0.00

Total charged

$1,125.08

Charged to Water under budget code 61-7120-5310.

Asset number
00332
Description
2025 Ram ProMaster 2500
Department
Water
Location
Water – Administrative
VIN
0FU5C0FTTKUHL81VD
Plate
NFS-1959
Current mileage
11,734
Asset condition
4Excellent