WO-22696

Tires & Wheels · Scheduled Repair — opened Sep 4, 2026 by Wes Thibodeaux

All work orders
CompletedNormal priority1Poor28,225 miClosed Sep 6, 2026RFP 4.2.4 · 4.3
Work order header
Mileage and an overall condition rating are required on every work order.
Job group
Tires & Wheels
Job condition
Scheduled Repair
Assigned to
Otis Brannon
Opened by
Wes Thibodeaux
Opened on
Sep 4, 2026
Closed on
Sep 6, 2026

Last recorded odometer on this asset: 30,110 mi

Tasks
Multiple tasks may be recorded on a single work order.
TR-ROT

Tire Rotation

Rotate tires per pattern and torque to specification.

Standard / actual

0.8 / 0.70 hrs

TR-ALN

Four-Wheel Alignment

Set caster, camber and toe to manufacturer specification.

Standard / actual

1.5 / 2.11 hrs

Employee labor
Hours are charged at each employee’s current hourly rate.
EmployeeTaskDateHoursRateCost
Otis BrannonTR-ROTSep 4, 20260.70$44.00$30.80
Neal FerraroTR-ALNSep 4, 20262.11$44.00$92.84
Labor subtotal2.81$123.64
Parts
Stock parts release from inventory; outside parts are charged to a searchable vendor.
PartSourceQtyUnit costExtended

DEC-UC-DOOR

Door Decal Set – County Seal

Outside vendor

Emergency Vehicle Upfitters

3$90.26$270.78

INJ-6.7

Fuel Injector – 6.7L Reman

Released from stock5$407.41$2,037.05

HY-HOS-12

Hydraulic Hose – 1/2in 2-Wire

Outside vendor

Emergency Vehicle Upfitters

4$78.06$312.24
Parts subtotal$2,620.07
Outside contractor costs
Vendor invoices charged directly to this work order.

No outside charges

Add a vendor invoice when work is performed by an external contractor.

Safety measurements
Tire tread depth and brake lining thickness recorded at each wheel position.
1 below minimum

Tire Tread Depth

LF6.4 /32 in
RF9.4 /32 in
LR5.2 /32 in
RR3.2 /32 in — below minimum

Brake Lining Thickness

LF9.2 mm
RF8.7 mm
LR8.3 mm
RR6.2 mm
Technician notes
Photographs
Attach photographs of the asset or of damage for documentation.

Driver side front quarter panel

IMG_8302.jpg

Driver side front quarter panel

IMG_4909.jpg

Emergency lighting installation complete

IMG_5840.jpg

Cost summary

Labor

2.81 hrs

$123.64

Stock parts

1 lines

$2,037.05

Outside parts

2 lines

$583.02

Outside repair

0 invoices

$0.00

Total charged

$2,743.71

Charged to General Government under budget code 10-4110-5310.

Asset number
00916
Description
2021 Honda Camry
Department
General Government
Location
General Government – Motor Pool
VIN
EV2CZTPAR6DTGARAJ
Plate
LMJ-7672
Current mileage
30,110
Asset condition
3Good