WO-20878

Body & Upfit · Scheduled Repair — opened Jun 27, 2026 by Priya Raghunathan

All work orders
CompletedNormal priority1Poor119,072 miClosed Jun 29, 2026RFP 4.2.4 · 4.3
Work order header
Mileage and an overall condition rating are required on every work order.
Job group
Body & Upfit
Job condition
Scheduled Repair
Assigned to
Dee Kowalczyk
Opened by
Priya Raghunathan
Opened on
Jun 27, 2026
Closed on
Jun 29, 2026

Last recorded odometer on this asset: 122,000 mi

Tasks
Multiple tasks may be recorded on a single work order.
BD-COL

Collision Repair Coordination

Coordinate estimate, authorization and outside body repair.

Standard / actual

1.0 / 0.93 hrs

BD-EL

Emergency Light Upfit

Install emergency lighting, siren and control head.

Standard / actual

8.0 / 7.52 hrs

Employee labor
Hours are charged at each employee’s current hourly rate.
EmployeeTaskDateHoursRateCost
Dee KowalczykBD-COLJun 27, 20260.93$48.00$44.64
Marcus DillardBD-ELJun 27, 20267.52$58.00$436.16
Labor subtotal8.45$480.80
Parts
Stock parts release from inventory; outside parts are charged to a searchable vendor.
PartSourceQtyUnit costExtended

BLM-4411

Blower Motor – HVAC

Released from stock6$115.91$695.46

TR-P22560

Tire – P225/60R18 Pursuit

Released from stock6$206.09$1,236.54

BT-65-850

Battery – Group 65, 850 CCA

Released from stock2$180.58$361.16
Parts subtotal$2,293.16
Outside contractor costs
Vendor invoices charged directly to this work order.

No outside charges

Add a vendor invoice when work is performed by an external contractor.

Safety measurements
Tire tread depth and brake lining thickness recorded at each wheel position.

No measurements recorded

Safety measurements are captured on brake, tire and preventive maintenance work.

Technician notes
Photographs
Attach photographs of the asset or of damage for documentation.

No photographs attached

Add photos of the asset or of damage.

Cost summary

Labor

8.45 hrs

$480.80

Stock parts

3 lines

$2,293.16

Outside parts

0 lines

$0.00

Outside repair

0 invoices

$0.00

Total charged

$2,773.96

Charged to Water under budget code 61-7120-5310.

Asset number
00726
Description
2012 International 114SD
Department
Water
Location
Water – Treatment Plant
VIN
BFMTFR6C03MZTKRB2
Plate
CMV-8668
Current mileage
122,000
Asset condition
4Excellent