WO-21542

Electrical · Warranty Repair — opened Nov 12, 2025 by Neal Ferraro

All work orders
CompletedNormal priority3Good107,738 miClosed Nov 12, 2025RFP 4.2.4 · 4.3
Work order header
Mileage and an overall condition rating are required on every work order.
Job group
Electrical
Job condition
Warranty Repair
Assigned to
Ray Fontaine
Opened by
Neal Ferraro
Opened on
Nov 12, 2025
Closed on
Nov 12, 2025

Last recorded odometer on this asset: 108,979 mi

Tasks
Multiple tasks may be recorded on a single work order.
EL-BAT

Battery Replacement

Replace battery, clean terminals and test charging system.

Standard / actual

0.7 / 0.73 hrs

EL-ALT

Alternator Replacement

Replace alternator and belt; verify charging output.

Standard / actual

2.5 / 2.33 hrs

Employee labor
Hours are charged at each employee’s current hourly rate.
EmployeeTaskDateHoursRateCost
Ray FontaineEL-BATNov 12, 20250.73$48.00$35.04
Dee KowalczykEL-ALTNov 12, 20252.33$48.00$111.84
Labor subtotal3.06$146.88
Parts
Stock parts release from inventory; outside parts are charged to a searchable vendor.
PartSourceQtyUnit costExtended

HY-HOS-12

Hydraulic Hose – 1/2in 2-Wire

Released from stock5$68.47$342.35

GR-EP2

Chassis Grease – EP2 Cartridge

Outside vendor

NAPA Auto Parts – Monroe

1$9.11$9.11

MIR-F150

Mirror Assembly – F-150 Driver

Released from stock5$186.99$934.95

BT-65-850

Battery – Group 65, 850 CCA

Outside vendor

NAPA Auto Parts – Monroe

1$222.11$222.11
Parts subtotal$1,508.52
Outside contractor costs
Vendor invoices charged directly to this work order.

No outside charges

Add a vendor invoice when work is performed by an external contractor.

Safety measurements
Tire tread depth and brake lining thickness recorded at each wheel position.

No measurements recorded

Safety measurements are captured on brake, tire and preventive maintenance work.

Technician notes
Photographs
Attach photographs of the asset or of damage for documentation.

Driver side front quarter panel

IMG_8772.jpg

Windshield chip prior to replacement

IMG_7013.jpg

Left front tire tread depth measurement

IMG_1107.jpg

Cost summary

Labor

3.06 hrs

$146.88

Stock parts

2 lines

$1,277.30

Outside parts

2 lines

$231.22

Outside repair

0 invoices

$0.00

Total charged

$1,655.40

Charged to Human Services under budget code 10-5310-5310.

Asset number
00100
Description
2018 Honda Malibu
Department
Human Services
Location
Human Services – Outreach
VIN
EBZL9ZJUVX1ASVD4D
Plate
CXP-9257
Current mileage
108,979
Asset condition
1Poor
Related work orders

No other work orders recorded for this asset.