WO-21469

Brakes · Outside Repair — opened Apr 25, 2026 by Tanya Oyelaran

All work orders
CompletedLow priority3Good147,658 miClosed Apr 27, 2026RFP 4.2.4 · 4.3

Mileage corrected on this work order

Previously recorded as 78,242 mi. Corrected to 147,658 mi by Marcus Dillard on Aug 12, 2026.

Work order header
Mileage and an overall condition rating are required on every work order.
Job group
Brakes
Job condition
Outside Repair
Assigned to
Otis Brannon
Opened by
Tanya Oyelaran
Opened on
Apr 25, 2026
Closed on
Apr 27, 2026

Last recorded odometer on this asset: 150,349 mi

Tasks
Multiple tasks may be recorded on a single work order.
BR-FR

Front Brake Service

Replace front pads and rotors; inspect calipers and hardware.

Standard / actual

2.0 / 2.04 hrs

Employee labor
Hours are charged at each employee’s current hourly rate.
EmployeeTaskDateHoursRateCost
Otis BrannonBR-FRApr 25, 20262.04$44.00$89.76
Labor subtotal2.04$89.76
Parts
Stock parts release from inventory; outside parts are charged to a searchable vendor.
PartSourceQtyUnit costExtended

TR-11R225

Tire – 11R22.5 Drive

Released from stock5$430.96$2,154.80

AF-2266

Air Filter – Heavy Duty

Released from stock4$51.47$205.88
Parts subtotal$2,360.68
Outside contractor costs
Vendor invoices charged directly to this work order.
VendorInvoiceDescriptionAmount
Waxhaw Radiator WorksWAX-05047Transmission rebuild$5,603.98
Southern States EquipmentSOU-88420Body repair and refinish$1,695.80
Outside subtotal$7,299.78
Safety measurements
Tire tread depth and brake lining thickness recorded at each wheel position.
1 below minimum

Tire Tread Depth

LF5.5 /32 in
RF7.3 /32 in
LR6.5 /32 in
RR7.8 /32 in

Brake Lining Thickness

LF2.9 mm — below minimum
RF5.9 mm
LR6.4 mm
RR5.9 mm
Technician notes
Photographs
Attach photographs of the asset or of damage for documentation.

Windshield chip prior to replacement

IMG_5691.jpg

Undercarriage corrosion inspection

IMG_5893.jpg

Damage to rear bumper after backing incident

IMG_4446.jpg

Cost summary

Labor

2.04 hrs

$89.76

Stock parts

2 lines

$2,360.68

Outside parts

0 lines

$0.00

Outside repair

2 invoices

$7,299.78

Total charged

$9,750.22

Charged to Sheriff under budget code 10-4310-5310.

Asset number
00460
Description
2021 Dodge Charger Pursuit
Department
Sheriff
Location
Sheriff – Town Contract
VIN
JWJ6149P6SR8FKD20
Plate
ZKF-1253
Current mileage
150,349
Asset condition
3Good